New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould

Still deciding? Get samples of $ !
Order Sample
Product Details
Customization: Available
Warranty: 1 Year
Shaping Mode: Injection Mould
Shipping
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Guarantee
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW PayPal
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
to see all verified strength labels (18)
  • New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
  • New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
  • New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
  • New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
  • New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
  • New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
Find Similar Products
  • Overview
  • Specification
  • Packing & Delivery
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
YD00807
Surface Finish Process
Polishing
Mould Cavity
Single Cavity
Plastic Material
ABS
Process Combination Type
Single-Process Mode
Application
Car
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO
Standard
HASCO
Customized
Customized
After-sales Service
Provide Mold Maintenance Guidance
MOQ
1 Set
Lead Time
45 Days
Environmental Protection and Compliance
Complies with RoHS Environmental Standards
Transport Package
Wooden Box
Specification
1500mm*600mm*200mm, ABS material
Trademark
Auto Mold
Origin
Zhejiang, China
HS Code
8480719090
Production Capacity
350 Sets

Packaging & Delivery

Package Size
200.00cm * 60.00cm * 40.00cm
Package Gross Weight
6.000kg

Product Description

New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
Specification
Applicable Car Models
Medium sedans
Size (Length×Width×Height)
1500mm×600mm×200mm
Material
ABS (Acrylonitrile-Butadiene-Styrene Copolymer)
Color
Black (White, Silver, etc. customizable)
Packing & Delivery
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
• Package Contents: 1×Car Bumper, 1×Installation Manual, 1×Bolt Kit, 1×Quality Inspection Report

 • Shipping Time:  North America: 8 - 12 Business Days  Europe: 5 - 7 Business Days  Asia - Pacific: 3 - 5 Business Days

 • Shipping Cost: Free shipping on orders over US$500; For orders under US$500, shipping cost is US$50 for North America, US$40 for Europe, and US$30 for Asia - Pacific

 • Damage Protection: Free replacement for shipping damage

 • Tracking Instructions: DHL/UPS tracking number provided, which can be used to check the logistics status on the corresponding official website
Company Profile
YUDA MOLD
our company boasts a professional design team and mould project managers with rich experience, as well as a sound quality management system, which has passed the high-standard quality inspection and gained recognition from all partners. Our company equipped with a large number of machines, it owns a total of 82 sets of equipment, including 2 sets of 5-axis machines, high-speed milling machines, high-speed engraving machines, double-head EDM machines, drilling machines and deep-hole drilling machines.
 
Since its establishment, the company has always adhered to the corporate tenets of "Customer First, Integrity Service, Continuous Innovation" and "Being Down-to-Earth, Hardworking, Courageous and Aggressive". Guided by the core philosophies of "Creating Value for Customers" and "Quality and Safety First", it devotes itself to studying market demands and serves customers with solid professional skills and a pragmatic work attitude. The mission of Yuda is to create value for its customers, partners and employees.
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
New Energy Vehicle-Fit High-Strength Auto Bumper Injection Mould
FAQ
Q1: What is the warranty period for the car bumper injection mould?    
A: 1 YEAR. If there is any quality problem during this period, we will provide free replacement or repair.    

Q2:  What materials are car bumpers injection mould made of?
A:  Mainly ABS, PP (Polypropylene), or composite materials. ABS offers good impact resistance and durability; PP is lightweight and cost - effective; composites excel in high - performance scenarios.
Q3: How do I claim warranty service?
A: Email your order ID and issue description to ***@***.com. We'll respond within 24 hours.
How to maintain mold?
1. Pre-use Inspection (5-10 Minutes)
Appearance:  Check for cracks, deformation, or rust on the mold surface. Focus on the parting surface (the contact surface during mold clamping) for foreign objects (e.g., plastic residues, metal shavings). If any are found, wipe them clean with a soft cloth dipped in alcohol to avoid mold damage during clamping.
Components:  Inspect guide pillars and bushings (mold positioning parts) for sufficient lubrication. If dryness or abnormal noise occurs, apply specialized mold grease (avoid ordinary engine oil, which may corrode the mold). Ensure ejector pins (parts for pushing out products) are flexible and free from jamming.
Parameters: Verify that mold temperature and pressure settings match the material of the products to be produced (e.g., plastic, metal). Prevent mold overload caused by improper parameters (e.g.,excessively high temperature for high-temperature plastics may cause adhesion to the mold cavity).
2. Post-use Cleaning and Protection (Within 30 Minutes After Production)
Thorough Cleaning: Spray the mold cavity (space for product forming) and core with specialized mold cleaner to remove residual material residues. Dry with compressed air (to avoid rust from residual moisture). For molds with cooling channels, open the drain valve to empty accumulated water and prevent freezing cracks or channel blockages in winter.
Rust Prevention: After cleaning, apply a thin, even layer of anti-rust oil to metal contact surfaces such as the parting surface, guide pillars, and ejector pins (select a type compatible with subsequent production materials; e.g., avoid anti-rust oil that may contaminate plastic for plastic molds).
Finally, cover the mold with a dust cover to prevent dust accumulation.
What Is Mold Flow Analysis?
Why Do We Need It?
Simply put, it uses a computer to simulate the entire process of plastic injection molding in advance—it shows how molten plastic fills the mold and cools to harden. It's like a "digital rehearsal" for production. Without actually opening the mold or conducting trial production, you can see the flow of plastic and potential problems with the final product.
The core purpose is to avoid detours, save money, and improve product quality:
1. Cost savings: It prevents the need to modify the mold (which is extremely expensive) after it's been made due to discovered issues, and reduces the raw materials and time wasted on trial production.
2. Quality improvement: It identifies potential product defects (such as air bubbles, deformation, and dents) in advance, allowing these issues to be resolved before production begins.
3. Faster production: It optimizes cooling time (the longest part of the injection molding process), thereby increasing production efficiency.  
For example, when manufacturing a phone case, mold flow analysis can determine in advance "where the plastic enters the mold" and "how to cool it faster," preventing the finished case from being deformed or having visible marks.       

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now